Temporary treads providing safe, immediate access to upper levels

FOR SAFE, FAST MULTI-LEVEL ACCESS VIA OUR CONCRETE STAIR FORMWORK SYSTEM, FAST TREAD

Need to give your team quick and safe access between levels?

Safe-T-Tread is the answer.

PATENT PENDING: AU Pat App 2018202529

SAFE

FAST

EASY

Locking perfectly into the Fast Tread prefabricated concrete stair formwork system and made from durable non-slip steel, they’ll ensure your team can move safely between levels

Each Safe-T-Tread takes seconds to lock into place within the Fast Tread formwork – meaning almost instant access around the site for your team without waiting for the stairs to be core filled

Simply remove the treads prior to core fill and stack them for storage before using them again on future projects

What is Safe-T-Tread?

Safe-T-Tread is our patented, innovative, temporary tread system. Each tread only takes seconds to lock into our prefabricated concrete stair formwork system, Fast Tread, before the stairs are core filled. This gives your team safe and instant access to upper levels.

Manufactured from durable non-slip steel, Safe-T-Tread also helps protect the risers of your Fast Tread stairs and are reusable for future multi-level builds

PATENT PENDING: AU Pat App 2018202529

FOR A SAFER SITE

CHOOSE SAFE-T-TREAD

CALL US TODAY! +61 2 9052 5708

DOWNLOAD BROCHURE

You may also be interested in

Remove the need for load bearing walls in scissor stairs with Fast Beam
Peno Fab is the best solution for safe openings in slabs Fast Tread – Sydney’s best concrete formwork stairs

Contact Us

Do you have a requirement for preformed ‘stairmaster’ style stairs or prefabricated formwork or even just a general enquiry?

We would love to hear from you… simply fill in the form below or call or email us by using the contact details below.

GOULBURN, NSW

Australia wide: 1300 751 701

International: (+61) 2 9052 5708

NSW

Postal: PO Box 1103, Goulburn, NSW, 2580

Head Office: 69 Copford Road, Goulburn, NSW, 2580

Office: Newcastle, NSW, 2300

Yard: Penrith, NSW, 2580

Submitting Form...

The server encountered an error.

Form received.

QLD

Office: 53 Taylor Street, Bulimba, QLD, 4171

Yard: 5 Enterprise Place, Yatala, QLD 4207

VIC

Office: 11 Quinn Drive, Keilor Park, VIC, 3042

Yard: 23 Viewtech Place, Rowville, VIC, 3178

CONTACTS

Copyright © 2020 FTI Group Pty Ltd. All rights reserved

Remove the need for load bearing walls in scissor stairs with Fast Beam
Peno Fab is the best solution for safe openings in slabs Fast Tread – Sydney’s best concrete formwork stairs
Peno Fab is the best solution for safe openings in slabs Remove the need for load bearing walls in scissor stairs with Fast Beam Fast Tread – Sydney’s best concrete formwork stairs

Submitting Form...

The server encountered an error.

Form received.

Peno Fab is the best solution for safe openings in slabs Remove the need for load bearing walls in scissor stairs with Fast Beam Fast Tread – Sydney’s best concrete formwork stairs